P6 Cheat Sheet for STOp Events


  • Version
  • 297 Download
  • 182.53 KB File Size
  • June 10, 2019 Create Date

Production Stoppages are necessary events, but they're disruptive to the business needs of an Organization. Knowing how best to minimize production loss by optimizing STOp-events can significantly enhance a company's bottom line. Use these scheduling tips to help navigate and drive your next STOp-event (Shutdowns, Turnarounds, Outages & pitSTOps)...

When it comes to driving  STOp-events, knowing how to configure Primavera™ P6 is very important. Scheduling STOp-events requires that you use a variety of settings in Primavera™ P6 based on type of work, contract strategy, scheduling level, type of scheduling (DSM or SSM), and many more requirements to allow you to produced the most optimized Project Plan (this is also true in some degree for EPC projects). Take a look, and if you require any additional information, email me: ejlister@stonavigator.ca